Why Survey Control Decides Where a Tower Is Built

Image
By Michael Stern, JDS Development Group A structural engineer asks me, in nearly these words, why a surveyor sets control again before a foundation starts when the survey is already on the drawings. The question is fair, and the answer decides where a tower stands on a lot that has no room to absorb a mistake. This piece is for the architects, engineers and construction managers who inherit a survey and want to know what it can and cannot do for them. What Does a Surveyor Set Before a Foundation Starts? A surveyor sets physical control points on and around the site, each with a known position and elevation tied to a recognized reference. Every trade then measures from those points rather than from the drawing, which is only a picture of where things are meant to go. The drawing and the control are two different things. A survey drawing records what was found on one day, while control is a set of marks that can be occupied again, checked against each other and used whenever someone...

Why Elevator Count Is Set by Time and Not by People

Image
By Michael Stern, JDS Development Group At eight in the morning a lobby fills with people who all want the same thing, and a bigger car would not shorten the queue. 111 West 57th Street and the American Copper Buildings meet that morning from opposite geometries, one the most slender residential building in the Western Hemisphere and the other a pair of towers joined 300 feet up by a three story skybridge. This piece is for developers, architects and structural engineers who have been told that elevators are sized by headcount, and who want to see why the better answer is a measurement of time. How Are Elevators Sized for a Tall Building? They are sized against time. A traffic analysis asks how long a passenger waits for a car and how long a car takes to complete a full round trip, and the number of cars, their speed and the grouping of the shafts all come out of those two answers. The order matters, because each step depends on the one before it. First the design team decides wha...

Why a Floor Opening Stays Open Until the Machine Arrives

Image
By Michael Stern, JDS Development Group A note on a structural drawing says that an opening in a slab is to remain open until the equipment is set. I read that note before almost anything else, because it tells me the building holds a machine that will never fit through any door the building will have. This is written for developers, architects, structural engineers and construction managers on towers where the largest equipment has to be placed while the structure is still rising. Why does a floor opening stay open on a tall building? Because the heaviest machines are larger than any finished stair, shaft or doorway, so the only route in is an opening the structure leaves open until the machine is set. An elevator machine, a damper or a large piece of mechanical equipment arrives as a single object, and its size and weight are fixed by the manufacturer before the building around it is finished. Once the floors, the facade and the partitions close in, the route that carried the ob...

Why Concrete Strength Tests Set a Tower Schedule

Image
By Michael Stern, JDS Development Group Wherever the frame of a tall building is concrete, the pace of the work is set by a wait, and I see it most clearly when I set 111 West 57th Street beside The Brooklyn Tower. The first stands in the courtyard of the landmarked Steinway Hall and is the tallest and most slender residential building in the Western Hemisphere. The second is Brooklyn's first supertall, rising from the landmark Dime Savings Bank. I am writing for developers, architects, structural engineers and construction managers who build or plan a concrete tower and want to know what its schedule is really measuring. My claim is that the clock is the rate at which placed concrete gains enough strength to carry the next lift, and that the strength test is therefore the most important schedule document on the job. What actually sets the pace of a concrete tower? The time it takes placed concrete to gain enough strength to be loaded. Every other part of the floor cycle can b...

Why an Unlisted Product Is Approved One Project at a Time

Image
By Michael Stern, JDS Development Group On every building I have worked on that had few precedents, there has been at least one assembly sitting in a laboratory with nothing behind it in any code table. The thing is real. It is fabricated, instrumented, waiting for a load, and it has no permission to be installed in the building it was made for. That gap, between a product that exists and a product a city will accept, is the subject here. I am writing it for developers about to commit to something unusual, for architects of record who will carry the filing, and for construction managers holding a schedule around it. The route through the gap is well worn, and almost nobody plans for it the first time. A code carries what has already been proven, written down as classifications, standards and acceptance criteria. A product outside that record is not forbidden, only unrecognized. Unrecognized is a condition with a procedure attached to it. What happens when the building code has no ...

Why a Finished Tower Is Still Measured for Wind

Image
By Michael Stern, JDS Development Group 111 West 57th Street and The Brooklyn Tower both have to answer the same question, and the question has nothing to do with how either one looks. It is what the building actually does in wind once it is finished, occupied and standing in weather that no model produced. This is written for structural engineers, for wind consultants, and for the developers who end up paying for the instruments that answer it. The first is the tallest and most slender residential building in the Western Hemisphere, built in the courtyard of the landmarked Steinway Hall and designed by SHoP Architects. The second is Brooklyn's first supertall, rising out of the landmark Dime Savings Bank. One is a needle threaded into a constrained site and the other grows up out of a masonry banking hall, and those two starting conditions hand the wind two very different objects to push on. Measuring a scale model in a wind tunnel has been the accepted basis for tall building...

Why Few Trades Can Build a Building With Few Precedents

Image
By Michael Stern, JDS Development Group Photo by Gio L on Unsplash A shop drawing comes back from a fabricator with a note in the corner saying the radius shown can be held on three of the four unit types and not on the fourth. That one sentence decides more about a facade than the elevation it was submitted against. On a building with few precedents it usually arrives before anyone has agreed what the building will finally look like. This is written for developers and architects working on buildings whose assemblies no product line already answers. The note records the boundary of what one particular shop can make. That boundary is the governing constraint on the piece, and it appears nowhere in the drawings the design team produced. What a Shop Drawing Actually Governs A shop drawing is produced by the company that will make the thing. The architect draws intent, dimension and performance, and the fabricator draws the object that will exist, including its joints, its tolerances...

Why Bids on an Unfamiliar Building Come Back With Questions

Image
By Michael Stern, JDS Development Group A bid set for an unusual building goes out to a short list of contractors, and the first thing that comes back is a list of questions. Sometimes that list runs to several pages, and it arrives well before the date the numbers are due. Developers, construction managers and architects working on buildings with few precedents learn to read it as the first honest feedback the documents have ever had. Reading it that way is possible only because competitive bidding has a formal question period built into it. That period exists for a reason worth understanding before the first answer gets written. Why Bidding Acquired a Formal Question Period Competitive bidding rests on a single assumption, which is that every firm pricing the work is pricing the same work. The assumption holds only if every firm is reading the same documents and reading them the same way. Nothing about a drawing set guarantees that on its own. A drawing is a description o...

Why Some Towers Leave a Floor Open to the Wind

Image
By Michael Stern, JDS Development Group Somewhere above the occupied floors of a very slender tower there is a level with no walls and no glass, open to the air on all four sides. From the sidewalk it reads as a gap in the building, a band of shadow where the windows stop and then start again. It is there because of what moving air does to a tall narrow prism, and it is one of the few places in a tower where the shape of the building and the behavior of the wind are a single decision. This is written for architects, structural engineers and developers looking at a footprint that is too small for the height they want. The question underneath it is how much of a tall building has to be given up to the air before the rest of it will hold still. How Wind Sheds Vortices Off a Tall Tower Air arriving at a tall building does not flow smoothly around it. It separates at the corners and rolls off each face in turn, first one side and then the other, in a rhythm rather than a steady push. That ...

Why Peer Review Is Bought on a Building With Few Precedents

Image
By Michael Stern, JDS Development Group A second structural engineer opens the calculations of the first and works the problem again from the beginning. On a tower whose behavior no code table describes, that duplicated effort is bought on purpose, and it belongs inside the design schedule rather than at the end of it. This is written for developers, engineers of record and construction managers about to take on a site where the ordinary references stop being useful. What Structural Peer Review Actually Is Peer review is an independent structural engineer, retained separately from the design team, reading the load path, the analysis assumptions and the calculations that sit behind a design. The reviewer does not take over the design and does not become the engineer of record. The reviewer reads what the team produced and says where the reasoning does not hold. On a conventional building the code has already done most of that work. Wind loads come from a published standard, the fr...